March 2023

Oceanking’s Ducale 120 ready for technical launch

Oceanking’s Ducale 120 ready for technical launch

The Ducale 120 launched at the facilities of the Ocean King Shipyard in Chioggia (Venice) is ready for technical sea trials.

The first Ducale 120 series that will be soon to delivered its owner. The yacht with a displacement GT 334 with a length of 36.80 meters, with a beam of 8.50 meters, it is a sturdy superyacht with a steel hull and aluminum superstructures. The external lines are by the VYD studio which also took care of the interiors, while the engineering was developed by Ginton Naval Architects and Studio inNave.

The Ducale 120 with the soul of a true Explorer has a highly efficient hull with forward bulb, designed to optimize and minimize fuel consumption ensuring a range of 5,500 nautical miles and equipped with two MAN engines. Characterized by a three-deck configuration, she offers 250sqm of open spaces with large surfaces along the decks that offer uninterrupted visual contact with the water from bow to stern.

The owner’s strong interest in the Ocean King Shipyard was immediately shown with this specific design that allowed him a high level of customization and unique features such as the construction of two swimming pools. A seawater swimming pool was built between the wide and deep stern beach and the main deck so as to create an environment of continuity with the internal saloon. On the Sun Deck we find the second heated swimming pool, surrounded by large sun beds, a mobile bar for guests and the possibility of organizing and arranging external loosing furniture with multiple arrangements based on the owner’s future needs.

The result is a great balance between the large external areas and the internal living spaces. Interior characterized by modern and elegant lines, rich in details and games between the different materials used and of great comfort. The guests in the living room will be able to enjoy lots of light thanks to the large side windows that can be opened to full height on to the side walkways, which are also glazed.

Also on the Main Deck towards the bow is the wide-body owner’s master suite. Going down the lower deck from the suspended staircase, we find the 2 VIP cabins and the 2 double cabins reserved for guests.
The areas designed for 7 crew members consist of three double cabins with sitting area, kitchenette and laundry on the lower deck at the bow, while the captain’s cabin is located on the upper deck.
The garage, with lateral opening to the right of the ship, can accommodate toys and a tender of 6 mt.

These last two years have been of great excitement for the Ocean King Shipyard which has also undertaken the construction of the DOGE 400 already sold and now under construction.

More information about DUCALE 120. Click here

BACK